Kembla Grange 1, NSW

The existing composting facility consists out of 2 composting tunnels with a combined capacity of 20.000 t/a. The input material is a mixture of food and green organics (FOGO) and commercial food.

All input streams are decontaminated and afterwards mixed in a pre-treatment line. The mixture is fed by a front loader into the tunnel. The tunnels have been upgraded with MECBIO’s door system, aeration units, central air and water treatment and automation system.

The 2 composting tunnels take their fresh air need from the processing building. To maintain a constant negative pressure in the building, preventing odours to escape. The central hall suction is connected via a by-pass to the humidifier fan. The tunnel exhaust air, combined with bypassed hall air flows through a humidifier to saturate the exhaust air as much as possible preventing the biofilter material from drying-out. The biofilter cleans the air, before exhausting to the atmosphere.

Client

Soilco

Scope

Retrofit of the existing composting tunnels, leachate and air treatment system.
20,000 t/a Food and Green Waste (FoGo)
Tunnel units, door system, humidifier, water management and control system.

Operational

2017
Scroll to Top

Contact Us or Send Me Quote